Welcome to Web Site of Governership of Samsun...
3 Sep 2010 Friday /
Türkçe
youtube video izle samsun

Governership 
General Structure
Economic Structure
Social Structure
Districts
Local Governments
Public Org.
Province Info. Sys.
City Guide
Local Press
Links

SERVICES    
 

1. Trade
    1.1. Domestic Trade           
    1.1.1. Market Contact of the Province with Neighboring Provinces

    1.2. Foreign Trade
    1.3. Distribution of Import and Export 1995-01.01.2007
    1.4. Firms That Have Performed High Level Export By Years
    1.5. Firms That Performed High Level Export Within the Year 2002 
    1.6. First Ten Firms That Performed High Level Export Within the Year 2003
    1.7. Members That Performed  Export  Worth Over 1 Million Dollars Within the Year
    1.8. First 10 Firms of Samsun in Export Samsun Within the Year 2005(Tim) 
    1.9. Export Data In Terms Of Section

    1.10. Firms Founded by Years
    1.11. Firms  Closed Down by Years  
2.Finance
    2.1. Comparison of Tax Accrual  - Collection of the Years ( YTL )
    2.2. Distribution of Public Income and Expanses of Samsun Province İli Kamu Gelir-Gider Dağılımı (2006) (YTL)
3. Access
    3.1. Distance Schedule of Samsun and  Districts
    3.2. Roads
    3.3. Projects
            3.3.1. Samsun Freeway (Gökdelen İnş.)
            3.3.2. Samsun-Ünye State Road
                       3.3.2.1. (Samsun-Nitrojen)Ayr.-Ünye (Tubin İnş.)
                       3.3.2.2. (Samsun-Nitrojen)Ayr.-Ünye İKmal İnş. (Arslanlar İnş.)
                       3.3.2.3. (Samsun-Ünye) Supply Construction (Tubin İnş.)
                       3.3.2.4. (Ünye-Piraziz) I.Zone Supply Construction (Yüksel İnş.)
            3.3.3. Samsun-Sinop State Road
                       3.3.3.1. (Samsun-Bafra) (Akyapı İnş.)
                       3.3.3.2. (19 Mayıs-Yakakent) (Akyapı İnş.)
                       3.3.3.3 Yakakent-Gerze  (Cengiz İnş.)
            3.3.4. Samsun-Çorum State Road
                       3.3.4.1. Samsun-Kavak (Duygu İnş.)
                       3.3.4.2. Kavak-Merzifon I.Zone (Kolin İnş.)
                       3.3.4.3. Kavak-Merzifon II.Zone (John Laing-Mapa İnş.)
            3.3.5. Samsun Province Road Betterment Works
                       3.3.5.1. Alaçam-Kızlan-Çerçiler  (Bayburt İnş.)
            3.3.6. New Works
                       3.3.6.1. Çarşamba-Ayvacık-Taşova (Between Ayvacık-Alparslan)
                       3.3.6.2. Çarşamba-Salıpazarı (Çarşamba Exit)
                       3.3.6.3. Taşova-Ayvacık
            3.3.7. Bridge Construction
                       3.3.7.1. Celtek Gorup Bridges
                       3.3.7.2. Reparation of Historical Bridges
            3.3.8. Other Works
                       3.3.8.1. Samsun West Freeway
                       3.3.8.2. Samsun East Freeway Project
    3.4. Traffic
            3.4.1. Traffic Accidents Status and Team Activities (2006-2007)
            3.4.2. Distribution of Registered Motor Vehicles (Unit)
    3.5. Airlines
    3.6. Sealines
            3.6.1. Privatization of the Port
    3.7. Railways
           3.7.1. Development of Railway Transportation by Years
    3.8. Communication
            3.8.1. Development of the Communication System by Years
            3.8.2. Capaciousness of Telekom (2005)
            3.8.3. Basic Data of Türk Telekom
    3.9. Energy
            3.9.1. Mines
            3.9.2. Mine Availability, Information on Reserves ve Grades
    3.10. Electricity
              3.10.1. Sectoral Distribution of Electricity Consumption (2006) (Mwh)
              3.10.2. Numbers Concerning Electricity Subscribers

1. Trade

Top

1.1.  Domestic Trade

Trade is prominent as the most important economic activity in our province which is the Center of the Black Sea Region in respect of geographical position, accessibility and economical potential. The population which has gradually grown as a natural consequence of the process of influx from the rural areas to the city has greatly contributed to this situation.

.

Top
1.1.1. Market Contact of the Province with Neighboring Provinces

Market Name

Market Contact

Amasya

Vegetables, Fruits, Crops, Oily Seeds, Pulses, Medical and Agricultural Drugs

Tokat

Crops, Fruits, Weighage, Agricultural Tools

Çorum

Crops, Vegetables

Sinop

Crops, Fruits, Weighage, Agricultural Tools, Cement, Construction Tools, Dry goods, Garments,

Ordu

Crops, Fruits Weighage

İzmir

Garments, Fruits, Industrial and Commercial Products

Zonguldak

Iron, Steel

 

Top

1.2. Foreign Trade

MOST IMORTED PRODUCTS: Mineral Coal, Scrap Iron, Electrode, Grain, Diesel Oil, LPG, Forestry Products, Ammonium Sulphate, Sulphuric Acid, Copper Ore, Walnut, Pulp, Molasses, Sunflower Oil, Reaper (Returned Goods) etc.
MOST IMPORTED COUNTRI ES: Russian Federation, Georgian, Romania, Germany, Bulgaria, Austria, Argentina, Australia, Ukraine, China etc.
MOST EXPORTED COUNTRİES PRODUCTS: Citrus, Tomatoes, Grapes, Wheat Flour, Construction Iron, Minibuses, Electrical Outfit, Onion, Potatoes, Cristal Sugar, Chicken, Sourdough, Valve, Tobacco, Blister Copper, Turkish Delight, Reaper (Temporary Export) etc.
MOST EXPORTED COUNTRIES: Russian Federation, Germany, England, Iraq, Georgia, Italy, Arabia, Lebanon etc.

CHİEFLY EXPORTED PRODUCTS (2006 )

COMMODITY KIND

AMOUNTI

COST ($)

Eatable Vegetables and some root lumps..

1.069.125

573.495,75

Eatable Vegetables and eatable hard – shell fruits; citrus and watermelon and melon skins..

49.088.542,25

27.338.759,22

Coffee, Tea, Paraguay Tea and Spice

240

725

Milling Products; Malt; Starch, Inuline; Wheat Gluten

1.797.000

394.000

Oily Seeds and Fruits; various beads, seeds and fruits, plants used in industry and medicine, hay and rough feed..

20.000

16.000

Sugar and Products

103.058

171.681,31

Cocoa and Cocoa Preparations

37.767

93.033,69

Vegetables, Fruits, Hard – Shell Fruits and Preparations Obtained from Other Parts of the Plants

28.082

72.819,96

Various Eatable Nourishments and Their Preparations

195.220

212.650,7

Beverages, Alcoholic Drinks and Vinegar

12.586,24

6.742,6

Tobacco and Processed Materials Substituting Tobacco

424.625

477.131,27

Salt; Sulphur; Earth and Stones; Plaster, Lime and Cement

52.500

1.303,85

Mineral oils and product obtained from their distillation; bitumen materials; mineral candles..

10.000

13.700

Inorganic Chemicals; Organic and Inorganic ... of Valuable Alcohols, Radioactive Elements, Rare Earth Metals and Isotopes

18.515,6

7.225,09

Organic Chemical Products

12,75

288,55

Volatile Oils and Resinoids; Parfumery, Cosmetics or Toilette Preparations

2.808

3.780

Soaps, Surfactant Organic Materials, Washing Preparations, Lubrication Preparations, Artificial Candles, Preparation Candles…

2.160

2.965

Albuminoid Materials; Changed Starch Inclusive Products Undergone; Glues; Enzymes

750

1.425,62

Various Chemical Materials

1

844,91

Plastics and Products

26.530,65

74.264,11

Rubber and Rubber Commodities

0.06

22,03

Wood and Timber Commodities; Charcoal

455.569,7

223.181,19

Printed Books, Newspapers, Pictures and Other Printed Industry Products, Hand and Machine Written – Texts and Plans

80

185

Wadding, Felt and Non-Woven Hosiery; Special Strings; Cords, Cordons, Ropes, Hawsers and  Commodities Produced  Out of These

15.900

110.600

Carpets and Other  Floor Coverings Produced Out of wovable Materials

1.250

7.907,01

Non-Woven Clothing  and Accessories

3

125

Other Finished Commodities Produced Out of Wovable Materials; Suits,; Second Hand Clothing and Second Hand Commodities Produced Out of Wovable Materials; Rags

6.614

68.438,42

Commodities Produced Out of Stones, Plaster, Cement, Amiant, Mica or Quasi Materials

24.860

5.058,57

Ceramic Products

180

340.14

Glass and Glass Commodities

383

1.204,44

Iron and Steel

12.802.375

5.056.792,24

Commodities Produced out of Iron and Steel

1.374.771,29

1.162.362,26

Aluminium and Aluminium Commodities

31.937,72

168.675,4

Base Metals

45.001

15.732

Nuclear Reactors, boilers, machines, mechanical devices and tools; their components and parts..

404.246,45

1.594.986,27

Electrical machines and devices and their components and parts; devices intended to record sound and give the recorded sound out..

4.193

32.872,44

Motor vehicles, tractors, bcycles, motorcycles and other land vehicles; their components and partsı..

126.442

684.970,79

Optical tools and devices, Tools and Devices Pertaining to Photography, Cinema, Measurement, Contolling, Adjustment, Medical and Surgical Tools and Devices; Their Components, Tools and Accessories

12

7.395,32

Furniture, Medical and Surgical Furniture, Beddings, Commercial Lamps, Lighted Name Plates, Prefabs..

42.805,28

110.243,68

Military Materials

293.834,4

249.837,36

 

Top

1.3.  Distribution of Import and Export 1995-01.01.2007

Years

Import (M) $

Export (X) $

Total $

X/M  %

2001

83.908.000

36.181.000

 

 

2002

105.830.000

34.589.000

 

 

2003

190.858.000

54.414.000

 

 

2004

309.953.000

143.934.000

 

 

2005

354.534.000

140.584.000

 

 

2006

346.870.000

158.210.000

 

 

Resource: Samsun Chief  Revenue Office   X / M :Export Coverage Ratio 

EXPORT

 

 

 

 

 

 

YEARS

NUMBER OF FIRMS

TOTAL AMOUNT ($)

CHANGE (%)

2001

98

36.181

 

2002

118

34.589

-4,40%

2003

116

54.414

57,30%

2004

133

143.934

164,50%

2005

160

140.584

-2,30%

2006

150

158.210

12,50%


IMPORT

 

 

 

 

 

 

YEARS

NUMBER OF FIRMS

TOTAL AMOUNT ($)

CHANGE(%)

2001

138

83.908

 

2002

138

105.830

26,10%

2003

153

190.858

80,30%

2004

213

309.953

62,40%

2005

222

354.534

14,40%

2006

203

346.870

-2,20%

 

Top

 1.4. Firms  That Have Performed High Level Export By Years

RANK

FIRM NAME

EXPORT $


1997

1

Karbir Dış Ticaret A,Ş,

8,665,480,30

2

Ulusoy Un Sanayi ve Ticaret A,Ş,

7,610,484,30

3

Unsan Un Sanayi ve Ticaret A,Ş,

5,988,648,00

4

Özdemirler Fındık San,ve Tic,A,Ş,

4,336,000,00

5

MNK Dış Ticaret Ltd,Şti,

3,010,206,80

6

Karadeniz Bakır İşletmeleri A,Ş,Samsun Exploitation Management

2,622,360,43

7

Yapay Jüt Çuval Sanayi A,Ş,

1,867,336,00

8

Dinçer Oto Gıda Sanayi ve Ticaret A,Ş,

1,583,046,00

9

Samsun Makine Sanayi Ticaret A,Ş,

1,268,300,00

10

Erişler Gıda San,ve Ticaret A,Ş,Samsun Agency

1,108,928,20


1998

1

Dinçer Oto Gıda Sanayi ve Ticaret A,Ş,

4,995,144,00

2

Ulusoy Un Sanayi ve Ticaret A,Ş,

4,600,154,00

3

Özdemirler Fındık Sanayi ve Ticaret A,Ş,

3,387,847,00

4

Samsun Makine Sanayi A,Ş,

2,902,528,00

5

Ulusoy Gıda Maddeleri Ticaret A,Ş,

2,727,652,00

6

Erişler Gıda Sanayi ve Ticaret A,Ş,Samsun Agency

2,158,804,00

7

FKK Güney Oto Lastik Takoz San,ve Tic,A,Ş,

2,138,584,00

8

Unsan Un Sanayi ve Ticaret A,Ş,

2,064,493,00

9

Yapay Jüt Çuval Sanayi A,Ş,

1,653,758,00

10

MNK Dış Ticaret Ltd,Şti,

1,412,935,00


1999

1

Karadeniz Bakır İşletmeleri A.Ş. Samsun Exploitation Management

9,761,101

2

Samsun Makina Sanayi A,Ş,

6,406,755

3

Özdemirler Fındık Sanayi ve Ticaret A,Ş,

3,528,146

4

FKK Güney Oto Lastik Takoz San,ve Tic,A,Ş,

3,180,000

5

Yapay Jüt Çuval Sanayi A,Ş,

1,324,465

6

Ulusoy Un Sanayi ve Ticaret A,Ş,

1,248,686

 

2000

1

Karadeniz Bakır İşletmeleri A,Ş,Samsun Exploitation Agency

8,682,312

2

Samsun Makina Sanayi A,Ş,

6,775,044

3

Ulusoy Un San,ve Tic,A,Ş,

2,812,843

4

Unsan Un San,A,Ş,

2,722,020

5

Özdemirler Fındık Sanayi ve Ticaret A,Ş,

2,028,699

6

FKK Güney Oto Lastik Takoz San,ve Tic,A,Ş,

1,140,849

 

2001

 

 

1

Karadeniz Bakır İşletmeleri A.Ş. Samsun Exploitation Agency

18,586,790

2

Samsun Makina Sanayi Anonim Şirketi

6,705,828

3

Ulusoy Un Sanayi Ve Ticaret Anonim Şirketi

5,783,135

4

FKK Güney Oto Lastik Takoz Sanayi ve Ticaret A,Ş,

2,607,706

5

Unsan-Un Sanayi Ve Ticaret Anonim Şirketi

2,544,323

6

Yapay Jüt Çuval Sanayi Anonim Şirketi

2,514,570

7

Özdemirler Fındık Sanayi Ve Ticaret Anonim Şirketi

1,929,964

8

Fibra Tekstil Sanayi Ticaret A,Ş,

1,105,226

9

Sürsan Su Ürünleri Sanayi Ve Ticaret Anonim Şirketi

1,095,325

10

Sampa Otomotiv Sanayi Ve Ticaret Limited Şirketi

1,076,311

 

Top

1.5. Firms That Performed High Level Export Within the Year 2002 

Rank

Exporting Firm

Export($)

1

Samsun Makina Sanayi Anonim Şirketi

9,287,976

2

Karadeniz Bakır İşletmeleri Anonim Şirketi Samsun Exploitation Management

6,277,924

3

Sürsan Su Ürünleri Sanayi Ve Ticaret Anonim Şirketi

3,198,895

4

Sampa Otomotiv Sanayi Ve Ticaret Limited Şirketi

2,724,270

5

Fibra Tekstil Sanayi Ticaret A.Ş.

2,687,677

6

Çakıroğlu Gıda Sanayi ve Tic.A.Ş.

2,637,718

7

Ulusoy Un Sanayi Ve Ticaret Anonim Şirketi

2,263,665

8

İda Triko Tekstil Sanayi Ticaret A.Ş.

2,038,574

9

Yiğit Koll.Şti.(Şemsettin Yiğit-Gülden Yiğit)

1,731,504

10

Özdemirler Fındık Sanayi Ve Ticaret Anonim Şirketi

1,396,728

 

Top

 1.6. First Ten Firms That Performed High Level Export Within the Year 2003

Rank

Firm Name

Export $

1

Samsun Makina San. A.Ş.

8,372,414

2

Çakıroğlu Gıda-Tarım Ür.-Hayv. Ve Yem Tavukç.-Nakl. Tic. Ve San. A.Ş.

5,023,962

3

Sampa Otomotiv San. Ve Tic. Ltd.Şti.

5,007,274

4

Ulusoy Un San. Ve Tic. A.Ş.

4,487,467

5

Sürsan Su Ürünleri San. Ve Tic. A.Ş.

3,991,803

6

Fibra Tekstil Sanayi Ticaret A.Ş.

3,972,748

7

Borsan Elektrik Malzemeleri İmalat San. Ve Tic. Ltd.Şti.

3,823,088

8

İda Triko Tekstil Sanayi Ticaret A.Ş. Samsun Agency

2,979,029

9

Yiğit Tic. Kollektif Şirketi Şemsettin Yiğit Ve Gülden Yiğit

2,872,673

10

As Çelik Döküm İşleme San. Ve Tic. Ltd.Şti.

1,937,320

 

Top

1.7.Members That Performed  Export  Worth Over 1 Million Dollars Within the Year

Rank

FIRM

EXPORT($)

1

Yıldız Entegre Ağaç Sanayi ve Ticaret A.Ş.

41,209,414.13

2

Ulusoy Un Sanayi ve Ticaret A.Ş.

12,210,033.63

3

Samsun Makina Sanayi A.Ş.

8,598,868.40

4

Sampa Otomotiv Sanayi Ve Ticaret Limited Şirketi

8,043,513.33

5

Yeşilyurt Demir ÇeKme Sanayi Ltd.Şti.

7,657,000.00

6

Erhan Ulusoy Un Gıda San veTic.A.Ş.

4,019,090.50

7

As Çelik Döküm İşleme San. Ve Tic. Ltd.Şti.

3,097,184.00

8

Unsan Un Sanayi ve Ticaret A.Ş.

2,812,682.00

9

Özdemirler Fındık Sanayi Ve Ticaret Anonim Şirketi

2,802,751.60

10

Yiğit Tic. Kollektif Şirketi Şemsettin Yiğit Ve Gülden Yiğit

2,470,414.10

Top

1.8. First 10 Firms of Samsun in Export Samsun Within the Year 2005(Tim) 

RANK

FIRM

EXPORT($)

1

Yıldız Entegre Ağaç Sanayi ve Ticaret A.Ş.

24,664,976.55

2

Erişler Gıda San.A.Ş.

23,178,041.18

3

Yılmaz Kardeşler Gıda San.Tic.A.Ş.

17,885,351.28

4

Samsun Makina Sanayi A.Ş.

11,201,296.20

5

Sampa Otomotiv Sanayi Ve Ticaret Limited Şirketi

8,682,320.66

6

As Çelik Döküm İşleme San. Ve Tic. Ltd.Şti.

7,428,050.60

7

Yılmaz Tar. Ürün. Tic. ve San.A.Ş.

6,977,244.00

8

Bafra Eriş Un Yem Gıda San.ve Tic.A.Ş.

6,848,531.25

9

Ulusoy Un Sanayi ve Ticaret A.Ş.

6,771,735.90

10

Yeşilyurt Demir ÇeKme Sanayi Ltd.Şti.

6,338,940.00

Resourcek:TİM , Erişler Gıda A.Ş. not a firm in Samsun

Top

1.9. Export Data In Terms Of Section


SECTION

SECTION NAME

2006

01

Livestock

0

02

Meat and Eatable Offal

0

03

Fish, Crustaceans, Molluscs, Other Spineless

1.540.588

04

Dairy Products, Bird and Poultry Eggs, Honey etc.

0

05

Other Animal Products Not Included in Another Part of the Schedule

0

06

Live Plants and Floriculture Products

0

07

Eatable Vegetables and Some Root Lumps

137.216

08

Eatable Fruits, Nuts, Citrus and Melon Skin

15.511.057

09

Coffee, Tea, Paraguay Tea and Spice

2.827

10

Grain

0

11

Milling Products, Malt, Starch, İnulin, Wheat Gluten

27.480.850

12

Oily Seeds and Fruit, Industry Plants, Hay, Animal Feed

21.982

13

Lacs, Resins, Plant Saps and Extracts

0

14

Wovable Plant Materials, Plant Products

0

15

Animal Fat and Plant Oils and Productsı

0

16

Animal Prreparations From  Meat, Fish, Crustaceans, Molluscs etc.

0

17

Sugar and Products

1.545.679

18

Cacao and Cacao Preparations

1.105.149

19

Preparations Whose Substance Is Grain, Flour, Starch, Milk

137.649

20

Canned Vegetables, Fruits, Plant Pieces, Hard – Shelled Fruits

1.574.994

21

Various Eatable Nourishment Preparations

30.563

22

Beverages, Alcoholic Drinks and Vinegar

1.271.257

23

Food Industry Remnants and Remains, Ready-Made Animal Nourishments

0

24

Tobacco and Processed Materials Substituting Tobacco

0

25

Salt, Sulphur, Earth and Stones and Plaster and Cement

2.091.083

26

Metal Ores, Cinder and Ash

0

27

Mineral Fuels, Mineral Oils and Products, Candles

312.240

28

Inorganic Chemical Products, Organic, Inorganic Composites

47.650

29

Organic Chemical Products

1.617

30

Pharmaceutics Products

11.036

31

Fertilisers

128

32

Extracts, Paints, Pastes and Gums Used in Tanning and Painting

191.653

33

Volatile Oils, Resinoids, Perfumery, Cosmetics, etc.

54.120

34

Soaps, Surfactant Organic Materials, Washing and Lubrication Materials.

93.501

35

Albuminoid Materials, Glues, Enzymes, etc.

52.308

36

Gunpowder, Explosives, Pyrotechnics Products, Matches, etc.

0

37

Commodities Used in Photography, Cinematography

0

38

Various Chemical Materials

41.195

39

Plastic and Commodities Produced Out of Plastic

2.869.589

40

Rubber and Commodities Produced Out of Rubber

891.324

41

Raw Hides, Leathers (Excluding Furs) and Stout Leathers

0

42

Leather Commodities, Saddlery Commodities, Travel commodities, Commodities Produced Out of Intestines

12.922

43

Hides, Furs, Imitated Furs and Products

0

44

Wood and Commodities Produced out Of Wood; Charcoal

2.627.605

45

Cork and Commodities Produced Out of Cork

0

46

Products Produced Out of Straw, Reed and Quasi Materials

383

47

Wood Pulp, Pulp of Fibred Cellulosic Materials, Scraps

0

48

Paper and Cardboard; Paper Produced Out of Paper Pulp and Commodities Produced Out of Cardboard

102.696

49

Printed Books, Newspapers, Pictures etc. Handwritings Which Are Product of Printing Industryı

117.021

50

Silk

0

51

Wool, Bristle, Horse Hair; Their Strings and Fabrics

0

52

Cotton

4.139

53

Wovable Plant Fibres, Paper Silk and Fabrics

2.748

54

Wovable Artificial and Synthetic Fibres

2.133

55

Synthetic and Artificial Discontinuous Fibres

1.582

56

Wadding, Felt, Non-Woven Hosiery, Special Strings, Cords and Products

98.236

57

Carpets and Other  Floor Coverings Produced Out of wovable Materials

13.289

58

Specially Woven Hosiery, Lacework, Tapestry, Embrodiery

99.403

59

Impregnated, Smeared, Covered Hosiery and Technical Commodities Out of These

5.233

60

Knit Commodity

554

61

Knitwear and Accessories

188.340

62

Un-Knitwear and Accessories

852.069

63

Other Commodities, Second Hand Commodities, Rags Produced From Hosiery

125.441

64

Shoes, Leggings, Gaiters and Quasi Commodities and Their Components

164.725

65

Headings and Their Components

801

66

Umbrellas, Walking Sticks, Whips, Scourges and Their Components

3.817

67

Ready-Made Feather and Human Hair Products, Artificial Flowers

0

68

Commodities Produced Out of Stones, Plaster, Cement, Amiant, Mica or Quasi Materials

145.037

69

Ceramics Products

28.333

70

Glass and Glass Commodities

300.533

71

Pearls, Valuable Stone and Metal Products, Coinage

0

72

Iron and Steel

47.021.254

73

Commodities Produced Out of Iron or Steel

6.727.039

74

Copper and Commodities Produced Out of Copper

934.919

75

Nickel and Commodities Produced Out of Nickel

0

76

Aluminium and Commodities Produced Out of Aluminium

2.876.855

78

Lead and Commodities Produced Out of Lead

3.312

79

Zinc and Commodities Produced Out of Zinc

0

80

Stannic and Products

0

81

Other Base Metals, Cermets and Commodities Produced Out of These

0

82

Tools, Cutler’s Tools, Tableware Produced Out of Base Metals

229.425

83

Various Commodities Produced Out of Base Metals

284.598

84

Nuclear Reactors, Boilers; Machines and Devices, Tools, Parts

21.259.875

85

Electrical Machines and Devices, Components and Parts

2.022.351

86

Railroad Vehicles and Quasi Components and Parts

4.060

87

Motor Vehicles, Tractors, Bicyciles, Motorcycles and Other

10.143.709

88

Aircraft, Space Vehicles Components and Parts

0

89

Vessels, Marine Vehicles

0

90

Optical, Photographic, Cinematographic Measurement, Control, Adjustment Devices, Medical Equipment.

1.141.898

91

Timepieces and Their Components and Parts

0

92

Musical Instruments; Their Components, Parts and Accessories

725.351

93

Arms and Ammunition, Their Components, Parts and Accessories

0

94

Furniture, Enlightenment, Commercial Lamps, Prefabs

2.843.450

95

Toys, Game and Sports Equipment, Components and Parts

0

96

Various Commodities

19.365

97

Works of Art, Collectors’ Items, Antiques

0

98

Weapons of War

57.912

 

Top

1.10. Firms Founded by Years

Years

Individual Person  

Coll.

Com.

Corp.

Limited

Coop.

Inc.

Foreign

Total

1990

69

6

-

19

42

9

-

-

145

1991

69

3

-

14

58

11

-

-

155

1992

64

8

1

26

127

33

-

-

259

1993

61

1

-

33

231

40

-

-

366

1994

59

1

-

27

298

30

-

-

415

1995

104

-

-

23

334

50

1

-

512

1996

112

-

-

22

386

33

1

-

554

1997

91

-

-

37

538

279

-

-

945

1998

109

1

-

25

367

19

-

-

521

1999

147

-

-

55

161

3

-

-

366

2000

182

-

1

38

197

10

-

2

430

2001

139

1

1

28

165

6

-

3

343

2002

135

2

1

29

165

10

-

-

342

2003

112

-

-

20

170

9

-

-

312

2004

264

-

-

43

251

6

-

-

546

2005

224

1

-

47

343

18

-

-

636

2006

165

-

-

114

470

19

-

-

705

 Resource: Samsun STO  
 

Top

1.11. Firms  Closed Down by Years     

Years 

Individual Person

Coll.

Com.

Corp.

Limited

Coop.

Inc.

Foreing

Total

1991

4

1

-

-

-

-

-

-

5

1992

8

3

-

2

-

-

-

-

13

1993

45

1

-

3

5

13

-

-

67

1994

193

30

1

5

15

21

-

-

265

1995

217

15

1

14

18

20

-

-

285

1996

265

17

2

5

15

12

-

-

316

1997

160

14

-

6

18

11

-

-

209

1998

162

7

1

10

28

12

4

-

224

1999

1170

5

-

13

28

13

2

-

1231

2000

66

3

-

20

59

18

1

-

167

2001

127

6

-

44

77

37

-

-

291

2002

122

5

1

30

38

13

-

-

209

2003

118

7

1

25

24

4

-

-

179

2004

135

3

-

26

62

28

-

-

254

2005

69

1

0

24

61

14

-

-

169

2006

139

4

-

21

101

20

-

-

285

2. Finance

Top

2.1.Comparison of Tax Accrual  - Collection of the Years ( YTL )

Years

Accrual

Collection

Ratio (%) (Accr./Coll.)

2003

516.526.243

435.247.974

84.26

2004

853.954.227

584.077.271

68.40

(Increase between 2003 – 2004

% 65

% 35

 

2005

1.013.511.235

703.725.347

69,43

(Increase between 2004 – 2005)

% 19

% 21

 

2006

1.189.778.744,54

865.327.942,34

73

Source: Samsun Headship of Tax Administratio

Top

2.2. Distribution of Public Income and Expanses of Samsun Province (YTL)

Budget Type

Budget

Final Account

General Budget

Revenue

398.142.063,48

398.142.063,48

Expenses

1.117.773.023,27

1.117.773.023,27

Supplementary Budget

Revenue

 

 

Expenses

 

 

Circulating Capital Budget

Revenue

305.890.365,91

305.890.365,91

Expenses

303.236.876,90

303.236.876,90

Special Budgets

Revenue

 

 

Expenses

 

 

Funds

Revenue

 

 

Expenses

 

 

Total

Revenue

704.032.429,39

704.032.429,39

Expenses

1.421.009.900,17

1.421.009.900,17

 

Top

3. Access

Our Province holds the means to access to every part of the country via Samsun – Ankara, Samsun – Amasya – Tokat, Samsun – İstanbul, Samsun – Trabzon – Rize roads.
Of our village roads, 1.619 Km is asphalted, 4.869 Km is stabilized, 1.853 Km is evened, 184 Km is raw. State Roads within the Province Borders is 779 Km long. 392 Km of it is state road and 387 Km of it is province road.

Top

3.1. Distance Schedule of Samsun and  Districts

Samsun

 

 

 

 

 

 

 

 

 

 

 

 

 

 

79

 Alaçam

 

 

 

 

 

 

 

 

 

 

 

 

 

70

149

Asarcık

 

 

 

 

 

 

 

 

 

 

 

 

65

144

135

 Ayvacık

 

 

 

 

 

 

 

 

 

 

 

50

29

120

115

Bafra

 

 

 

 

 

 

 

 

 

 

36

115

106

29

86

Çarşamba

 

 

 

 

 

 

 

 

 

85

164

55

150

135

121

Havza

 

 

 

 

 

 

 

 

50

129

20

115

100

86

35

 Kavak

 

 

 

 

 

 

 

85

164

55

150

135

121

35

35

Ladik

 

 

 

 

 

 

36

43

106

101

14

72

121

86

121

19 Mayıs

 

 

 

 

 

51

130

121

45

101

15

136

101

136

87

S.pazarı

 

 

 

 

17

96

87

48

67

19

102

67

102

53

34

  Tekkeköy

 

 

 

59

138

129

52

109

23

144

101

144

95

34

42

Terme

 

 

115

194

85

180

165

151

30

65

65

151

166

132

174

V.köprü

 

94

13

164

159

44

130

179

144

179

58

145

111

153

209

  Yakakent

 

Top

3.2. Roads

Our Province holds the means to access to every part of the country via Samsun – Ankara, Samsun – Amasya – Tokat, Samsun – İstanbul, Samsun – Trabzon – Rize roads.
Of our village roads, 1.619 Km is asphalted, 4.869 Km is stabilized, 1.853 Km is evened, 184 Km is raw. State Roads within the Province Borders is 779 Km long. 392 Km of it is state road and 387 Km of it is province road.

3.3.Projects

Top

3.3.1. Samsun Freeway (Gökdelen İnş.) (Km:0+000–12,340)

Is the road No. 1977E040650 DPT, with a Project distance of 12,34 Km, in dual carriageway standard. The platform amplitude is 26 meters. The Project cost is 106.483.167 by the prices of 2007. The date of beginning is 1993 and the date of completion is 2010.   
Whereas the estimated cost is 216.609,91 YTL (1993 BF), the Project was given out by contract to Gökdelen İnş. Firm on 07.12.1993, with an allowance of 35 % and a bid price of 139.970.09 YTL.
Whereas the appropriation of the Project for the year 2007 is 1 000 000 YTL, 974.911 YTL of the said subvention has been spent. 79. 863. 167 YTL has cumulatively been spent in the previous years. 79 % pecuniary and 97 % physical realization has been achieved in the Project.
A section of 12.34 Km of Samsun City Passageway has been completed at the level of superficial paving up to now.
Karadeniz interchange and BSK works shall be conducted. A supplementary appropriation of 25.6 YTL is needed.

3.3.2.Samsun-Ünye State Road

Top

3.3.2.1. (Samsun-Nitrojen)Ayr.-Ünye (Tubin İnş.)(Km: 0+000 – 49+500)

Is the road No.1977E040650 DPT with a Project distance of 46.25 Km in dual carriageway standard. The Platform amplitude is 25 meters.  The Project cost is 98.486.284 YTL by the prices of 2007. The date of beginning is 1992 and the date of completion is 2008.
Whereas the estimate cost is 126.702 YTL (1992 BF), the Project was given by contract to TUBIN Inş. Firm on 21.12.1992, with an allowance of 29.88 % and a bid price of 126.702 YTL.
Whereas the appropriation of the Project for the year 2007 is 500 000 YTL, the said subvention has not been spent yet. 98. 164. 284 YTL has cumulatively been spent in the previous years.100 % pecuniary and 100 % physical realization has been achieved in the Project.
Rudimentary art works shall be completed with the appropriation of the year 207.
Whereas the partial temporary admission has been granted, the final accounts works have been commenced.

Top

3.3.2.2. (Samsun-Nitrojen)Ayr.-Ünye İKmal İnş. (Arslanlar İnş.) (Km: 49+500-55+000)

Is the road No. 1977E040650 DPT, with a Project distance of 6 Km, in dual carriageway standard. The platform amplitude is 25 meters. The Project cost is 13.814.828 by the prices of 2007. The date of beginning is 2004 and the date of completion is 2007.

The Project has been given by contract to Arslanlar İnş. Firm on 05.05.2004. Whereas the appropriation of the Project for the year 2007 is 1.681.080 YTL, the said appropriation has not been spent yet. 12.000.828 YTL has cumulatively been spent in the previous years.90 % pecuniary and 90 % physical realization has been achieved in the Project.

A section of 6 Km has been completed at the level of binder. It shall be completed at the level of depreciation. In case an appropriation of 133 Thousand YTL is granted, the road shall be completed at the level of depreciation.

 

Top

3.3.2.3. (SAMSUN-ÜNYE) İKMAL İNŞ. (TUBİN İNŞ.) (Km: 55+000-81+604)

Is the road No. 1977E040650 DPT, with a Project distance of 26.6 Km, in dual carriageway standard. The platform amplitude is 25 meters. The Project cost is 41.205.666 $ by the prices of 2007. The date of beginning is 1998 and the date of completion is 2008.
Whereas the estimated cost is 24.247.432 $, the Project was given by contract to TUBIN Inş. Firm on 21.12.1992 with an allowance of 18.02 % and a bid price of 19.904. 985 $.

Whereas the appropriation of the Project for the year 2007 is 572.300 $, the appropriation has been used for the manufacturing of the year 2006. 31.951.666 $ have cumulatively been spent in the previous years. 87 % pecuniary and 87 % physical realization has been achieved in the Project.

25.8 Km of the right hand lane and 25.7 Km of the left hand lane of the (Samsun-Ünye) Supply Construction has been completed at the level of binder up to now.
In case an appropriation of 8.7 Million $ is granted, the remaining 1 Km section shall be completed at the level of binder.

 

Top

3.3.2.4. (Ünye-Piraziz) I.Zone Supply Construction (Yüksel İnş.) (Km: 81+600-158+300 , 33+500-37+781)

Is the road No. 977E040650 DPT, with a tender distance of 32,6 Km BY and  31,4 Km TY. A 3 Km section of the road is within the borders of the province of Samsun.This 3 Km section has been completed at the level of binder and opened for traffic.
Whereas the Estimated Value is 44.830.848 $ , the Project has been given by contract to YUKSEL Inş.Firm on 14.10.1998 with an allowance of 18.15 % and a bid price of 36.278.309 .

Whereas the appropriation of the Project, whose Project Cost is 75.834.250 $, for the year 2007 is 826.002 $, the appropriation has been used for the manufacturing of the year 2006. A total of 49.773.250 $ has cumulatively been spent in the previous yers. 79 % pecuniary and 79 % physical realization has been achieved in the Project. A supplementary appropriation of 25.2 Million $ is needed so for the completion of the work..

A 3 Km section is within the borders of the Province of Samsun. Right hand and left hand lanes of the Akçay Passage have been completed and opened for traffic.

 
3.3.3. SAMSUN-SİNOP STATE ROAD

Top

3.3.3.1. (SAMSUN-BAFRA) (AKYAPI İNŞ.) (Km: 8+731-33+570)+(47+550-51+946)

Is the road No1993E040640 DPT with a distance of 34.36 Km, in dual carriageway standard. The platform amplitude is 25-35 meters. The Project Cost is 88.424.522 by the prices of the year 200. The date of beginning is 1997 and the date of completion is 2010.

Whereas the Estimated Value is 5.352.785 YTL, the Project has been given out by contract to AKYAPI Inş Firm on 06.08.1997, with an allowance of 47,62 % and a bid price of 2.803.789 YTL.
Whereas the appropriation of the Project for the year 2006 is 3.000.000 YTL jointly with 19 Mayıs-Yakakent Project, the appropriation has not been spent yet. A total of 77.493.522 YTL has been cumulatively spent up to now. 89 % pecuniary and 89 % physical realization has been achieved in the Project

Of the Samsun-Bafra road, 14.8 Km at the depreciation level and 34 Km at the binder level have been BY completed up to now. The Project is planned to be completed in the year 2007. A supplementary appropriation of 10.1 Millon YTl is needed for the completion of the work.

 

Top

3.3.3.2. (19 MAYIS-YAKAKENT) (AKYAPI İNŞ.)(Km: 33+570-47+550)+(51+946-86+500)

Is the road No 1993E040640 DPT with a Project distance of 47.29 Km, in dual carriage standard. The platform amplitude is 25-35 meters. The Project Cost is 107.089.950 YTl by the prices of the year 2007. The date of beginning is 1997 and the date of completion is 2010.

Whereas the Estimated Value is 6.036.899 YTL, the Project has been given out by contract to AKYAPI Inş. Firm on 02.12.1997 with an allowance of 45,90 % and a bid price of 3.265.961 YTL.
Whereas the appropriation of the Project for the year 2006 is 5.400.000 YTL, the appropriation has not been spent yet. A total of 37.611.750 YTLhas cumulatively been spent in the previous years. 38 % pecuniary and 38 % physical realization has been achieved in the Project

9.2 Km of 19 Mayıs-Yakakent road has been completed at  binder level up to now.
In case a supplementary appropriation of 14.3 Million YTL is granted, a section of 5.2 Km shall be completed at binder level.

Top

3.3.3.3 YAKAKENT-GERZE  (CENGİZ İNŞ.)(86+500-125+000)

Is the road No 1993E040640 DPT with a Project distance of 36,38 Km, in the standard of dual carriageway.  The platform amplitude is 25 meters. The Project cost is 327.528.020 $ by the prices of the year 2007. The date of beginning is 11998 and the date of completion is 2010.

Whereas the Estimated Value is 224.051.328 $, the Project has been given out by contract to CENGİZ Inş. Firm on 18.11.1998 with an allowance of 25.88 % and a bid price of 166.066.844$.

Whereas the appropriation of the Project for the year of 2007 is 3.609.740 $, a total of 30.680.070 $ has cumulatively been spent up to now. 16 % pecuniary and 16 % physical realization has been achieved in the Project.
An 8 Km section of Yakakent-Gerze road is within the borders of the Province of Samsun. 2.9 Km of the road has been BY completed at the level of  superficial paving.

Whereas the remaining project cost is 296.848.000 million $, In case a supplementary appropriation of 19.5 million $ is granted, the 2.9 km section shall be completed at the level of superficial paving and the reinforcement works shall be commenced.

3.3.4. SAMSUN-ÇORUM STATE ROAD

Top

3.3.4.1. SAMSUN-KAVAK (DUYGU İNŞ.) (Km:0+000– 48+500) 

Is the road No 1995E040250 DPT with a project distance of 48.50 Km, in the standard of dual carriageway. The platform amplitude is 25-35 meters. The Project Cost is 80.927.580 YTL by the prices of the year 2007. The date of beginning is 1997 and the date of completion is 2009.

Whereas the Estimated Value is 5.392.411 YTL (1997 BF), the Project has been given out by contract to DUYGU Inş. Firm on 04.08.1997  with an allowance of 53.85 % and a bid price of 2.488.598 YTL.
Whereas the appropriation of the Project for the year 2007 is 4.000.000 YTL, 3.999.948 YTL of the appropriation has been used for the manufactures of the year 2006. A total of 51.179.580 YTL has been cumulatively been spent up to now. 70 % pecuniary and 70 % physical realization has been achieved in the Project.

12 Km on the right hand lane and 12 Km on the left hand lane have been completed at the level of superficial paving up to now. A supplementary appropriation of 25.7 million YTL is needed for the completion of the Project. In case a supplementary appropriation of 16 million YTL is granted in the year 2007, a 3.5 km section shall be completed at the level of superficial paving. 200 % Ministers’ approval and an appropriation of 170 million YTL is needed for the completion of the entire road at the level of depreciation.

 

Top

3.3.4.2.KAVAK-MERZİFON I. ZONE(KOLİN İNŞ.) (Km: 48+500-83+800)

Is the road No 1995E040250 DPT with a project distance of 35.10 Km, in the standard of dual carriageway. The platform amplitude is 25 meters. The Project Cost is 36.570.492 € by the prices of the year 2007. The date of beginning is 2005 and the date of completion is 2010.

The Project has been given out by contract to KOLIN Inş. Firm with a bid price of 29.494.882 €. The appropriation of the Project for the year 2007 is 36.570.492 €, 1.802.163 € has been spent for the completion of 0.5 Km on the left hand lane and 8.5 km on the right hand lane at the level of binder.

The remaining proect cost is 28 million €. In the year 2007,  9.1 Km shall be completed with a supplementary appropriation of 5 million €. A supplementary appropriation of 1 million € is needed.

Top

3.3.4.3. KAVAK-MERZİFON II. ZONE (JOHN LAING-MAPA İNŞ.) (Km: 83+600-102+274)

Is the road No 1995E040250 DPT with a project distance of 18,67 Km, in the standard of dual carriageway. The platform amplitude is 25 meters. The Project Cost is 43.321.479 € by the prices of the year 2007. The date of beginning is 2005 and the date of completion is 2010.

The Project has been given out by contract to JOHN LAING+MAPA Inş. Firm on 30.09.2004 with a bid price of 35.253.618 €. Whereas the appropriation of the Project  for the year 2007 is 6.517.096 €, 1.966.586 € of the appropriation have been spent.

Viaduct and earth works have been conducted on T4 Tunnel. 8 km of the right hand lane shall be completed at the level of superficial paving with the appropriation for the year 2007 and a supplementary appropriation of 5.7 million €.
A n approximately 10 Km section is within the borders of the Province of Samsun.

3.3.5. SAMSUN İLİ İL YOLU İYİLEŞTİRME ÇALIŞMALARI

Top

3.3.5.1.ALAÇAM-KIZLAN-ÇERÇİLER  (BAYBURT İNŞ.) (Km:11+000-69+800)

Is the province road No1964E042100 DPT with a project distance of 58.8 Km, in the standard of betterment 1A. The platform amplitude is 12 meters. The Project Cost is 25.952.809 YTL by the prices of the year 2007. The date of beginning is 1999 and the date of completion is 2007.

Whereas the Estimated Value is 1.500.000 YTL, the Project has been given out by contract to BAYBURT Inş. Firm on 28.07.1998 with an allowance of % 11,51and a bid price of 1.327.350 YTL.
Whereas the appropriation of the Project for the year 2007 is  255.000 YTL, the appropriation has not been spent yet. A total of 24.513.809 YTL has cumulatively been spent in the previous years. 95 % pecuniary and 95 % physical realization has been achieved in the Project.

Alaçam-Kızlan-Çerçiler tender is within Road Betterment context. Whereas, on the 40 Km section within the borders of the Province of Samsun, Çerçiler and Kapaklı Village Locality, earth works, art works and basic works have been conducted, an 18 Km section has been completed at the level of superficial paving. A supplementary appropriation of 1.184.000 YTL is needed for the completion of the Project.

3.3.6.NEW WORKS

Top

3.3.6.1. ÇARŞAMBA-AYVACIK-TAŞOVA (AYVACIK-ALPARSLAN ARASI)

Is the province road No 1964E042100 DPT with a distance of 65 Km, in the standard of 3A (Class 3A Asphalt). The platform amplitude is 8 meters. The Project Cost is 4.666.694 YTL. The date of beginning is 2007. It has been added into the 2005 programme within the context of new works. The appropriation for the programme year is 50.000 YTL. Whereas was put into tender on 07.07.2005, the works have been conducted.
A supplementary appropriation of 3.4 million YTL is needed for the completion of the work.

Top

3.3.6.2. ÇARŞAMBA-SALIPAZARI (ÇARŞAMBA EXIT)

Is the province road No1964E042100 DPT, with a project distance of 4 Km, in the standard of 1A. The platform amplitude is 8 meters.The Project Cost is 4.473.000 YTL. The road shall depart from Ayvacık road, named Çarşamba-Salıpazarı (Çarşamba Exit), go by the south of the Çarşamba County and be connected to Salıpazarı road. It has been added to the investment programme in the year 2005. The appropriation of the programme is 60.000 YTL.

Top

3.3.6.3. TAŞOVA-AYVACIK

Is the road No1964E042100 DPT with a project distance of 50 Km. Project works between Ayvacık-Taşova Road and Alparslan-Taşova still continue.  Whereas the Project Cost is 5.000.000 YTL, the appropriation for the year 2007 is 60.000 YTL.

3.3.7.BRIDGE CONSTRUCTION

Top

3.3.7.1. ÇELTEK GROUP BRIDGES

The Project Cost of Vezirköprü Bridge No 2003E040260 DPT, on the State Road between Vezirköprü-Havza-Amasya is 2.117.838 YTL.  The year of beginning is 2005 and the year of completion is 2008. The appropriation for the programme year of 2005 is 400.000 YTL. It has been put into tender on 30.11.2005

Top

3.3.7.2.REPARATION OF HISTORICAL BRIDGES

The Project Cost of Kurt Bridge No 2000E040020 DPT within Vezirköprü County is 800.000 YTL. The date of beginning is 2005 and the date of completion is 2007. The appropriation for the year 2007 has been set as10.000 YTL.

3.3.8. OTHER WORKS

Top

3.3.8.1 SAMSUN WEST FREEWAY

Imminent to stop, Samsun West Freeway is a Project which departs from the tenth kilometre of Samsun-Ankara State Road and connects to Samsun-Sinop road via 19 Mayıs University junction and passes by the Towns of Atakum-Atakent and Kurupelit on the south. To facilitate the transport and to foster urbanization towards this direction via maintaining the transit traffic between Samsun and Sinop, this Project should be completed as soon as possible.

Top

3.3.8.2. SAMSUN EAST FREEWAY PROJECT

This 17 Km long projection is shall start from the Municipality Houses Junction which is the ending point of Samsun Freeway, arrive at Petrol Office Regional Directorate along the north of the railroad via the sea filling, and from there, shall make it to the Airport Junction to the north of Gelemen Agricultural Enterprise Settlement passing through the industrial zone.

A demand has been submitted to the General Directorate of Highways to have the Project added to the Highways Network and constructed.
The annual average of the daily traffic of the section of Samsun-Ordu Road between Municipality Houses and Tevekköy County is 42.000.
Areas of dense residence have been formed, furniture and automotive showrooms have been founded and commercial installations of various fields have been established on both sides of the section of Samsun-Ordu road that is between Municipality Houses Junction and Tekkeköy.  These installations have been burdening our road which bears intercity and international road attribute with local traffic. The fact that all the junctions are level crossings negatively effects the flow and the safety of the traffic.
In case the proposed route is constructed, the present road shall be left for the city traffic.      

Top

3.4. Trafic

Whereas the total number of registered motor vehicles throughout the province of Samsun was 162766 in the year 2005, this number has risen up to 171.051 with an increase by 5.09 %. A total of 178.350 people within the central county of the province have got a licence..

Top

3.4.1.Traffic Accidents Status and Team Activities (2006-2007)

YEAR

2006

2007

% PERCENT

Number of Fines Paid in Cash

1172

972

-17

Amount of Fines Paid in Cash

77.753 YTL

78.554YTL

+1

Number of Informed Records

15.602

22.885

+46

Amount of Informed Records

1.344.941 YTL

2.390.125YTL

+77

Total umber of fines

16774

23.857

+42

Total Amount of Fines

1.422.694YTL.

2.468.679YTL

+73

Total Number of Accidents

1866

2.115

+13

Accidents with Death

10

20

+100

Accidents with Injury

245

271

+10

 Number of Accidents with Material Damage

1611

1824

+13

Number of the People Who Died

13

26

+100

Number of the people Who Got Injured

489

527

+7

Amount of Material Damage

3.057.200 YTL.

3.522.555YTL

+15

Number of Vehicles Condemned From Traffic

1891

1873

+-1

Number of Drivers Committed for Trial

271

392

+44

 

Top

3.4.2.Distribution of Registered Motor Vehicles (Unit)

VEHİCLE TYPE

PROVİNCE CENTER

COUNTIES

PROVİNCE GENERAL

Motorcycles

7645

11858

19503

Automobiles

46212

31214

77426

Minibuses

3745

5684

9429

Buses

661

609

1270

Pick-ups

16508

13649

30157

Trucks

3575

3236

6811

Tractors

9977

30670

40647

Tow trucks

255

296

551

Special Purpose Vehicles

265

129

394

Tankers

211

42

303

Off – Road Vehicles

821

342

1163

Total

89875

97779

187654

 

Top

3.5.  Airlines

Samsun/Çarşamba Airport, completed early in the year 1999, was commissioned on 09.02.1999.
The airport has a Terminal Building of 12.000 m2, with a capacity of 2 Million passengers per year, other support buildings and all electric-electronic systems. Samsun/Çarşamba Airport, which has been declared as an air border entry with the decree of Council of ministers, is at international standards and continually services for domestic/international flights 24 hours a day.
3 scheduled flights as İstanbul/Samsun/İstanbul shuttle by Turkish Airlines; 1scheduled flight as İStanbul/Samsun/İstanbul shuttle by Onur Air are organized daily. In addition to this, Turkish Airlines organizes a flight for Pilgrimage annually, and in the summer, CHARTER flights are organized to various countries of Europe by Turkish Airlines, PEGASUS, ATLAS JET and MNG air ways. Moreover, some foreign airlines organize CHARTER flights.
Airport Directorate of State Airports Administration as the operating administration, and, in addition, Customs, Directorate of Customs Control, Airport Directorate of Meteorology, Coastal Health Control Office, Units from the Police Department and Military Police Command  and Turkish Airlines, OHY, ATLAS JET, PEGASUS A.Ş. as the airlines companies; ÇELEBİ YER HİZMETLERİ A.Ş., PEGASUSU HAVAYOLLARI A.Ş.,(for their own airplanes), and POAŞ (fuelling establishment) as the ground service suppliers, display activity on Samsun/Çarşamba Airport.
The fact that the Cargo Apron and the Cargo Terminal which were included in the Master plan of the Samsun/Çarşamba Airport, whose passenger and airplane traffic gradually increases, but not constructed is considered necessary to be taken into consideration so as to meet the need of Samsun and environs’ recently increasing cargo transportation.
It is considered necessary that Samsun/Ankara flights, which were organized in early 2000’s but later cancelled by reason of the economical crisis, savings and profitability, be reconsidered in accordance with today’s economical criteria and increasing passenger demands. 

Top

3.6. Sealines

Sea transportation is maintained with Samsun Port, thus, passengers and cargo are carried. Whereas the Port is 1.756 m. Long, its daily vessel holding capacity is 13-15, annual vessel capacity is 861, annual loading and unloading capacity is 2.500.000 tons. Within the year 2003, 945 ships have been served, a total of 2.768.736 tons of loading and unloading, 558.177 tons of which is loading 2.210.559 tons of which is unloading, has been performed.              

Top

3.6.1. Privatization of the Port

Ground services of Samsun Port is conducted by Turkish State Railways’ port directorate. Now that this service is both expensive and slow, it is lowly demanded by the traders and industrialists. When the competitive conditions are taken into consideration, it is vital that Samsun Port be privatized so that it can contribute better to the country’s and the province’s economy. The privatization process has commenced.

Top

3.7. Railways

Samsun is connected to Turkey’s Railway network via Samsun-Sivas and Samsun-Çarşamba Railways. Railway networks within the Port and Samsun Free zone are present.
The distance of Samsun-Sivas and Samsun-Çarşamba Railways within the borders of the Province of Samsun is 169 Km. The railway is prominently used for cargo.

Top

3.7.1.Development of Railway Transportation by Years

 

2002

2003

2004

2005

2006

Number of Trains (Unit)

420

436

436

1.179

1.695

Number of Arriving Passengers (People)

-

-

-

-

-

Number of Departing Passengers (People)

1.063.229

1.088.662

912.569

492.279

202.137

Amount of Arriving Freight (Tons)

251.465

308.531

318.736

381.033

50.291

Amount of Departing Freight (Tons)

332.433

372.924

533.434

332.636

403.915

Total of Freight Carried –Tons

583.928

681.455

852.230

713.669

454.206

    Resource:TCDD Samsun Gar Müdürlüğü

3.8. Communication

Top

3.8.1. Development of Communication System by Years

 

2001

2002

2003

2004

Telefon Santral Kapasitesi

138.009

145.022

150.117

152.049

Abone Sayısı (Adet)

134.777

136.338

156.535

163.669

    Kaynak:Türk Telekomünikasyon A.Ş. ( Samsun Merkez )

Top

3.8.2. Capaciousness of Telekom (2005)

Number of telephone Switchboards

251

 

 

Capacity of Automatic Telephone Switchboards

341.509

 

 

Number of Connected Subscribers

316.505

 

 

Number of Awaiting Applications

878

 

 

Number of Vehicle Phone Subscribers

641

 

 

Number of Call Systems

12

 

 

Number of Cable Tv Subscribers

9.923

 

 

Number of Turpak Subscribers

283

 

 

Number of Internet Subscribers

2.131

 

 

Number of Data Devre Subscribers

454

 

 

Number of Payphones

896

 

 

Resource: Türk Telekomünikasyon A.Ş. ( İl Geneli  )

Top

3.8.3. Basic Data of Türk Telekom

Basic Data (31.12.2005)

 

Density of Subscribers As Per Total Population (%)

                    26,18

Total Number of Subscribers Active Throughout the Province

316.505

Total Capacity of Switchboard Lines Assembled Throughout the Province

341.509

Capacity of Switchboard Lines with Input Distribution Active Throughout the Province

0

Number of Subscribers Awaiting Telephone Throughout the Province

878

Capacity of Telephone Lines Remaining Operative But Idle Throughout the Province

25.004

Number of Telephone Subscribers per 1 Personnel Throughout the Province

329,00

Total Number of Residences Receiving Automatic Telephone Service Throughout the Province

2.046

Total number of Trunks Active Throughout the Province (OGT-INC-BW)

33.929

Total Number of No:7 Trunks Throughout the Province (OGT-INC)

14.295

Number of Digital Channel Ports Assembled (K/P) Throughout the Province

1.833

Number of Analogue channel Ports Assembled (K/P) Throughout the Province

0

Total Number of Digital R/L Receivers/Transmitters

65

Total Number of Analogue R/L Receivers/Transmitters Throughout the Province

0

Total Length of Optical Fibre Network Throughout the Province( Meters)

1.520.000

Total Network Principal Capacity Throughout the Province

615.300

Principle Capacity of Network With Input Distribution Throughout the Province

0

Total Local Network Capacity  Throughout the Province

959.900

Total Local Network With Input Distribution Capacity Throughout the Province

0

Number of Payphones (Token) Active Throughout the Province

11

Number of Payphones (Card) Active Throughout the Province

553

Number of Payphones (Credit Card) Active Throughout the Province

320

Number of Payphones (Desktop) Active Throughout the Province

0

Number of Payphones (Total) Active Throughout the Province

884

Total Number of K.T.S. (WLL) Base Stations

13

Total Number of K.T.S. Lines Assembled Throughout the Province

1.792

Total Number of K.T.S. Subscribers Active Throughout the Province

1.421

Total Number of IDR Systems Throughout the Province

0

Total Number of NMT Base Stations Throughout the Province

11

Total Number of NMT Subscribers Active Throughout the Province

641

Total Number of Regional Call Systems Throughout the Province

4

Total Number of Call Center Subscribers Active Throughout the Province

12

Total Number of (DIAL-Up) TTNET Subscribers Throughout the Province

2.131

Total Number of (FRAME RELAY) TTNET Subscribers Throughout the Province

64

Total Capacity of TURPAK Port Throughout the Province

376

Total Number of TURPAK Subscribers Throughout the Province

283

Number of Point to Point (For Rent) Data Circuits (Inter City)

218

Number of Point to Point (For Rent) Data Circuits (Local)

236

Total Capacity of Cable TV Network Throughout the Province

28.925

Total Number of Cable TV Subscribers Throughout the Province

9.923

Total Number of Buildings Receiving Service Throughout the Province

274

Total Number of Uninterruptible Power Supplies Throughout the Province

8

Total Number of DC Power Sources Throughout the Province

264

Total Number of Generators Throughout the Province (Including Portables)

86

Number of Transmission Centres Throughout the Province

254

Number of R/L Stations Throughout the Province (Company Property)

2

Number of R/L Stations Throughout te Province (For Common Use)

1

Number of Switchboards Throughout the Province ( EWSD )

1

Number of Switchboards Throughout the Province (DMS)

15

Number of Switchboards Throughout the Province ( SI-2000 )

2

Number of Switchboards Throughout the Province ( AXE-10 )

0

Number of Switchboards Throughout the Province ( E-1 )

30

Number of Switchboards Throughout the Province (E-2 )

8

Number of Switchboards Throughout the Province ( DİCLE )

104

Number of Switchboards Throughout the Province ( LEVENT )

39

Number of Switchboards Throughout the Province ( ANADOLU )

44

Number of Switchboards Throughout the Province ( FIRAT )

0

Number of Switchboards Throughout the Province ( X-BAR )

2

Total Number of Switchboards Throughout the Province ( TOPLAM )

251

Number of remote Line Units Throughout the Province

6

Total Number of Credits for This Month Throughout the Province

107.810.335

Average Number of Credits per Subscribers Throughout the Province

340

Source: Türk Telekomünikasyon A.Ş. Samsun İl Müdürlüğü

3.9. Energy

Top

3.9.1. Mines

There are no metallic mines, industrial raw materials or primary power sources within the central county of Samsun. Only lignite in Havza and Vezirköprü, thermal spring in Havza and Ladik and mineral water in Bafra and Çarşamba are found Throughout the Province.

The percentages of the data concerning the value added, number of administrations, employment and wages relating to the sector of Mines and Quarries in Turkey’s total are respectively 8.12 %, 10.23 %, 34.58 % and 35.5 %.

Top

3.9.2. Maden Availability, Information on Reserves and Grades

Name of the Mine

Reserves (tons)

Grades (%)

Location and Locality

Cement Raw Materials

51.951.361

 

Ladik Yatağı

Lead, Zinc

177

4,5

Vezirköprü-Ersandıklı

Manganese

420

23,88

Kavak,Vezirköprü,Ladik

Bricks, tile

46.000

İyi

Dikbayır Yatağı

Lignite

4.721.000

 

Havza

Source: www.mta.gov.tr/Madenler/Samsun.htm

Top

3.10. Electircity

The consumption of electricity in Samsun in the year 2006 is 35.02 % in dwellings, 2.99 % in state offices, 2.99 5 in industry, 11.40 % for enlightenment and 6.99 % in other.
The subscribers of electricity in Samsun are 81.27 % in dwellings, 11.80 % in commerce, 0.32 % in industry, 0.66 % in state offices and 5.01 % in other.  

Having regard to the number of the subscribers, the dwellings hold the most share with 81.27 %. Trade facilities follow  the dwellings

 

Top

3.10.1. Sectoral Distribution of Electricity Consumption (2006) (Mwh)

Country
Rank

Provinces

Dwellings

Commerce

State Offices

Industry

Enlightenment

Other

Total

5

Zonguldak

172.148  

35.047  

15.541  

   1.747.599  

43.586  

19.034  

2.032.955  

23

Bolu

161.959  

51.533  

19.470  

   363.711  

32.335  

65.453  

694.461  

24

Samsun

510.710

190.024

49.757

659.420

67.406

116.516

1.666.833

36

Çorum

124.482  

27.097  

9.338  

190.769  

21.178  

24.515  

397.379  

39

Ordu

147.047  

23.999  

22.672  

178.850  

29.900  

9.349  

411.817  

40

Kastamonu

81.158  

14.722  

11.535  

162.599  

25.998  

13.178  

309.190  

42

Rize

83.502  

16.916  

9.276  

134.083  

27.401  

6.723  

277.901  

43

Karabük

57.767  

10.065  

2.095  

131.032  

12.043  

14.185  

227.187  

45

Yozgat

89.258  

13.790  

5.673  

121.400  

37.125  

22.589  

289.835  

46

Tokat

104.006  

12.947  

11.291  

117.410  

18.953  

21.541  

286.148  

47

Amasya

75.972  

12.847  

15.228  

111.670  

44.343  

18.586  

260.060  

48

Giresun

88.266  

17.157  

3.842  

103.221  

28.042  

11.311  

251.839  

53

Trabzon

174.090  

42.168  

59.143  

81.597  

35.226  

13.609  

405.833  

63

Kars

38.314  

7.273  

17.527  

45.842  

17.268  

258  

126.482  

65

Çankırı

35.073  

8.560  

13.950  

34.563  

10.731  

5.318  

108.195   

66

Sinop

52.326  

7.191  

8.513  

24.372  

8.555  

7.892  

108.849  

71

Gümüşhane

19.504  

3.126  

4.735  

9.440  

7.138  

1.782  

45.725  

77

Bayburt

14.480  

1.590  

2.450  

1.152  

5.583  

2.343  

27.598  

 

Turkey

18.514.435  

6.852.393  

3.805.458  

42.193.006  

3.310.237  

5.911.114  

 80.568.057  

    Source: TEDAŞ

Top

3.10.2. Numbers Concerning Electricity Subscribers

SUBSCRIIBER GROUP

NUMBER OF SUBSCRIBERS

% ACCORDING TO TOTAL NUMBER OF SUBSCRIBERS

CONSUMPTION (Mwh)

% ACCORDING TO TOTAL CONSUMPION

DWELLING

456.952

81,26639504

583.710,35

35,01912822

TRADE FACILITY

66.370

11,80353875

190.023,97

11,40030138

STATE OFFICE

3.686

0,655534787

49.756,56

2,985095764

INDUSTRY

1.799

0,319942236

659.419,53

39,56122614

PAID ENLIGHTENMENT

5.288

0,940441659

67.406,36

4,043978398

OTHER

28.194

5,014147529

116.516,12

6,990270092

TOTAL

562.289

 

1.666.832,89